Business segments
Hydropower
Data centres
Energy storages
Thermal power & waste to energy
Process industry
National & regional grid
Wind & solar power
Engine & hybrid power
Marine
Solutions
Automation, Protection & Excitation
Electrification solutions
Lifecycle services
Products
E-house
Excitation systems
Switchgears & Drive systems
Automation & Protection systems
Bus duct systems
References
News
Careers
About us
Company
Contact
Sustainability
Annual report
For media
Sponsorship
Contact us
en
fi
sv
Close ✕
Contact Us
Contact us
Select the most suitable category
*
Customer
Supplier or service provider
Job seeker or student
Feedback
Other
Select the most suitable category
Are you looking for a job or are you a student looking for an internship?
Read more:
https://career.veo.fi
What business segment does your matter concern?
*
Hydropower
Data centres
Energy storages
eHPG
Thermal power
Process industry
National and regional grid
Wind & solar power
Engine & hybrid power
Marine
Drives applications
Automation
Excitation solutions
Other
Other
Reason for reaching out
*
I want to place a request for quotation / order
I want to order service
I need information about a service / product
I want to offer VEO my company’s services
Contact info
First name
*
Last name
*
E-mail
*
Phone number
*
Company
*
Country
*
Tell us more
*
How do you prefer being contacted?
Phone
E-mail
Send
If you are human, leave this field blank.
Δ
References
All
Hydropower
Marine
National & regional grid
Process industry
Thermal power
Wind & solar power
Electrification and automation systems for Skellefteå Kraft’s Rengård hydropower plants
The project, including the modernisation of Rengård G1 and the extension Rengård G2, is a result of 10 years of close co-operation between VEO and Skellefteå Kraft.
Electrical modernisation of two hydropower plants for Glitre Energi
VEO has carried out the electrical modernisation of the 15 MW Djupdal and the 2 x 48.5 MW Skollenborg hydropower plants in Norway for client Glitre Energi Produksjon.
Electrical modernisation of 23 MW hydropower plant for Helgeland Kraft
VEO has provided client Helgeland Kraft with a complete electrical modernisation of Fagervollan hydropower plant. The power plant was commissioned in 1990 and has an installed capacity of 23 MW and an annual production of 65 GWh.
Modernisation of historic hydropower plant for Fortum
Fortum had intended to modernise its 43 MW Untra power plant for a long time and when the time to launch this large-scale project finally arrived, VEO was selected to build the automation system covering all voltage levels.
Modernisation of 300 MW hydro power plant for Hafslund Eco
Norwegian company Hafslund Eco became the second largest power provider in Norway through a business merger with Eidsiva Energi in 2019. Eidsiva had been VEO’s customer for decades already and now the co-operation continues together with Hafslund Eco.
Modernisation of 42 MW hydropower plant for Statkraft
Statkraft is the largest energy producer in Norway and a large producer in Sweden. The modernisation project of the Bjurfors Övre plant is the first that VEO has done for Statkraft, and as such is very important.
Hydro Energi’s hydropower plant modernised to be safer, but with minimal impact on production
Built in the 1960s by Hydro Energi AS, a subsidiary of Norsk Hydro, the 340 MW hydropower plant in Suldal, Norway, was in a need of an upgrade. VEO's mission was to renew the main distribution systems.
Punctual E-House deliveries consolidated Ellevio’s trust in VEO
VEO has successfully connected Ellevio’s two latest wind farms in the north of Sweden to the national grid. In both the Bodmyran and Nordanberg turnkey projects, VEO utilised its own prefabricated E-House substation product, which was tailored according to the client’s needs.
Fortum trusts VEO with all scopes and sizes in wind power substations
Our park in Kalax is an important milestone in Fortum’s strategy to build gigawatt-scale, zero-emission renewable capacity. For this strategy, our collaborations partners are important, and we appreciate the expertise and flexibility VEO brings to our projects.
Grid modelling a part of VEO’s wind farm substation delivery to Energiequelle
VEO is proud to deliver two turnkey wind farm substations in Finland to its new customer Energiequelle, a German international project developer in renewable energy.
VEO in charge of the electrification of four MEYER WERFT and MEYER TURKU cruise liners
Being the largest deal of its kind in all of VEO’s history, the order involves the electrification of four cruise liners with an option for six more.
VEO och Luxcara utökar sitt befintliga samarbete till norra Sverige
Luxcara, en oberoende kapitalförvaltare inom förnybar energi från Hamburg, utökar sitt befintliga samarbete med finska elektrifieringsleverantören VEO till norra Sverige.
Electrification of 197.4 MW Guleslettene wind park
VEO has delivered a turnkey solution for the electrification of the 197.4 MW Guleslettene wind park, located on the west coast of Norway.
VEO futureproofs the primary distribution network in Lidingö, Sweden
In February 2020, VEO successfully completed the second 10/20kV substation renewal (Torsvik) in Lidingö, for the Swedish network operator Ellevio.
Two wind park substations to Swedish DNO Ellevio
In October 2019, VEO completed the delivery of two additional substations to Swedish distribution network operator DNO Ellevio.
Electrification solutions for Vantaan Energia’s Martinlaakso bioenergy heating plant
By successfully utilising a wide range of VEO's products and services, it was possible to deliver a complete supply of electrification for the bioenergy plant.
Unit and station automation renovation for Kemijoki Oy
Kemijoki Oy is one of the most significant producers of hydro and regulating power in Finland since it produces about one-third of Finland's total hydropower.
VEO delivered GIS substation to Savon Voima Verkko
In the summer of 2018, VEO delivered a new substation to Savon Voima Verkko Oy in Iisalmi, Finland.
Relay renovation partnership with Loiste
The renovation of the Sotkamo substation was completed at the turn of the year 2016-2017, followed by the Kanninmäki Substation in Kuhmo at the beginning of 2018.
MEYER WERFT cruise liners
In 2016, VEO secured a large order from the German shipyard company MEYER WERFT.
Neste Oy, Porvoo refinery
Neste has been one of VEO’s key customers in Finland ever since 2011, when an annual contract was put in place.
Ellevio – modular wind farm substation
VEO supplies A 145/36 KV wind farm substation to Ellevio.
Alta Kraftlag
VEO delivered a 145 KV substation to Alta Kraftlag SA in Northern Norway.
Corby Power Plant
VEO improved the safety of the operational staff at ESB's Power Plant.
Stora Enso
VEO changed the medium voltage switchgear cubicles for Stora Enso's Veitsiluoto factory.
Norbord’s new OSB3 line
In the autumn of 2016, VEO was trusted with the power supply of Norbord’s new OSB3 production line in Inverness, Scotland.
Savon Voima Verkko
Power company Savon Voima Verkko in Iisalmi, Finland is carrying out one of the largest power grid renewals in the company’s history.
SKÖVDE värmeverk AB Power plant project
At the beginning of 2015, VEO signed its largest thermal power contract in the company’s history.
Outokumpu Tornio Works
The line is a unique production line for a new product: ferritic stainless steel.
Multi-purpose vessel
The vessel is equipped with diesel electric machinery with an electric propulsion consisting of two converter controlled electric motors, each driving an azimuthing propulsion unit.
Keuruun Lämpövoima
"The production capacity has tripled and the total electricity production of Keuruun Lämpövoima Oy’s boilers at these premises exceeds 20 MW", says Tapio Ollila at Keuruun Lämpövoima.